Two cabinet numbers come back on the same building. The unit count matches. The cover sheet shows the same kitchen elevation. One total is higher, and the conversation turns to price.
That is often the wrong first question.
A revised layout, another finish, a different release date or a new delivery sequence can move a cabinet number without anyone changing how many apartments are in the building. Until both quotes describe the same work, you are not comparing price. You are comparing two different packages.
The pattern is familiar in multifamily preconstruction: the building stayed the same, and the scope did not.
For developers and general contractors, a useful reprice is an apples-to-apples conversation. At SCS Multifamily, we supply and install cabinetry, countertops and flooring. We treat a revised number as a chance to line up the drawings, the installed scope and the timing assumptions before anyone argues about the total.
Same building, different work
A total unit count leaves too much open. Two buildings with the same number of apartments can have different kitchen layouts, vanity quantities, amenity cabinetry and finish combinations. A change in the unit mix can change cabinet quantities even when the project total does not move.
If one quote follows the current drawings and the other still reflects last month’s layouts, the totals will diverge for reasons that have nothing to do with market price. The same thing happens when an alternate finish is folded into the base package on one side and kept separate on the other.
The current drawings, the unit mix by type and the finish schedule have to travel together. So does a short account of what changed since the last quote. Alternates belong beside the base number, not inside it. That is how a comparison stays honest.
A short change list gives the estimator somewhere to start. It also gives the owner, the GC and the designer a shared explanation when the revised price arrives. Without it, the higher number looks like inflation, and the lower number looks like a win. Either reading can be wrong.
This is the same standard SCS applies when comparing multifamily cabinet, countertop and flooring bids: a shared scope is the starting point, not a detail to reconcile after the fact.
Installed scope is the bid
An installed price for a multifamily cabinetry package is not a box count. It is the construction, the fronts, the hardware, the finished ends, the fillers, the toe kicks and the other specified details, plus the work required to get that package into the building and set.
Freight, unloading, storage, movement through the floors and installation all belong in the conversation. A delivery to a single staging area is a different arrangement from phased deliveries to several buildings. If the site cannot receive the full order at once, that constraint needs to sit next to the price, not surface after the buyout.
Mark allowances and exclusions so the project team can see where the cabinet scope starts and ends. If blocking, wall corrections, protection or another item belongs to a different trade, say so. Ambiguity here does not make a bid more competitive. It makes the first conversation after award harder to explain.
Cabinet layouts also touch the work around them. If a later revision changes the run, check the related countertop package and appliance information before release. Price the package as it will be installed, not as it appeared on an earlier sheet.
Dates belong beside the price
Quote expiration, approval, order release and site delivery are different milestones. A date without a definition is not a plan you can use. Ask what starts the quoted lead time, and which approvals or other requirements must be complete first.
The plan should also show the first areas the site needs and the sequence after that. A single delivery date rarely describes a phased multifamily project. Buildings come online at different times. Unit types are not always released together. Those priorities should be visible before anyone treats a date as a commitment.
If approvals move, have the supplier review the release and delivery assumptions and keep that response with the current quote. An old note about timing becomes misleading once the project calendar changes. The point is not to extract a promise. It is to keep the number attached to the conditions that produced it.
The import line needs its own reading
Import cost is one more assumption that should be visible. It is not a reason to treat two unmatched quotes as a tariff story.
As of November 2026, the December 31, 2025 presidential proclamation delays until January 1, 2027 the increase of the duty on covered imported kitchen cabinets and vanities from 25% to 50%, except for countries with an agreement. Read the proclamation.
Ask the supplier to identify any duty assumption included in the quote and how a change would be handled under the proposed terms. The importer and a customs adviser should confirm the treatment of the actual products, including origin, classification and the relevant entry timing. A purchase-order date by itself does not answer those questions.
Any effect on an installed package needs a project-specific calculation. The package also includes work and costs beyond the imported cabinets. Do not apply a headline tariff percentage to the full contract value. SCS does not promise tariff protection, and a responsible supplier will not either. The useful step is to make the assumption explicit so the next number can be read clearly.
What to send before the next number
A useful reprice does not require a long process memo. It requires a complete, current set of information:
- Drawing date and revision
- Unit count by type, with cabinet layouts
- Finish schedule and the specifications that apply
- Known changes since the previous quote
- Alternates listed separately from the base package
- The quote revision and the approved installed scope
- Open items, the person responsible for each, and a due date
- Required approval dates
- The planned delivery sequence
Keep one current record of those items through release. When the owner, GC, designer and supplier need to decide quickly, a single list beats a chain of emails.
Review the package with SCS
If you are repricing a multifamily cabinetry package, send us the current plans, unit mix, finish schedule and expected installation sequence. Include the previous quote and the known revisions.
Talk with SCS about your next project so we can review the scope and timing assumptions with your team.